- Application Filter
- Flooring
- Installation
- A specially trained application crew from parent company Stonhard will complete installation. First, patching, leveling, and priming of the substrate is needed. Components will then be mixed together and uniformly spread over the primed and sealed substrate using a squeegee and roll. A chemical reaction between components causes the mixture to harden. Mix and apply the topcoat sealant material over the hardened floor. Installation can only be completed when the slab and air temperatures are between 65° - 85° F. Relative humidity must be below 80%. Refer to manufacturer's documentation for additional information
- Suitable Substrates
- With the appropriate primer, concrete, wood or metal are suitable substrates. Due to the material's self-leveling nature, the substrate must be extremely flat and level (Ff/ Fl 50). Not recommended on asphalt, brick, quarry tile, mastic, or painted surfaces.