59% Water Based Plaster, 29% Paper, 12% Metallized Polyester
Format
Roll
Pattern Repeat
27 in V
Availability & Procurement
Availability
Confirm Stock Level with Sales Rep
Lead Time
Contact your rep for more information
Technical Specifications
Length
15
Applications & Usage
Application Filter
Wall
Installation
Wallcovering shall be installed by experienced workers and contractors in strict accordance with these instructions. Material must be dry table trimmed. Hang rolls in sequence, do not reverse. DO NOT DOUBLE CUT. Apply material to wall using a soft brush, plastic smoother, or drywall blade wrapped with a soft cloth to lay out the material. When smoothing, work from the center out to the edges. To avoid trapping air bubbles, use an oval seam roller to butt seams. Wash smoothing brush and seam roller often, as an accumulation of paste on tools may mark or scratch the material. Completely clean adhesive off the surface after each strip is hung. Wash seams with a damp sponge and clean, warm water. Change rinse water often. Any adhesive left on the surface can cause flaking. Dry carefully with a soft cloth or chamois. This wallcovering contains metallic particles and will conduct electricity. To avoid possible fire hazards or electric shock, wallcovering should not come in contact with or extend into electrical-outlet boxes or light-switch boxes. Turn off all electricity to the room prior to starting installation
Hanging Information
Non-reverse hang, straight match
Performance Metrics
Flammability
ASTM E84 Tunnel Test Class A - Flame spread 25, smoke developed 80 (test procedure is comparable to NFPA 255 and UL 723)
Light Blocking
Complete
Lightfastness
AATCC Method 16 - 40 hours - meets requirements
Maintenance
W - Water Based Foam or Cleaner
Sustainability
Human Health
Human Health Impact
CDPH Standard Method v1.2-2017, Low Emitting/Low VOC