Install all Plaster F-Molds using full ten-foot lengths wherever possible. Attach Plaster F-Molds over the weather resistant barrier (WRB) to the framing with nails, screws, or other approved fastening methods. A shiplap of building paper or WRB may need to be installed over the attachment flange if the Plaster F-Mold is being used as a stucco stop. All Plaster Trims must be cut accurately and installed with tight, neat joints. All nailing flanges must be covered with lath and all butt joints must be sealed. Manufacturer recommends that a carbide tip blade along with lubricant be used when cutting any aluminum trims