Please note that samples are provided for color and pattern selection purposes only and may not represent the complete system construction.
Warranty
1 year from date of installation
Manufacturer Notes
Stonhard offers a range of multilayered flooring systems, with each layer carefully engineered to meet the specific performance requirements of different applications. Please contact your Stonhard Architectural Design & Engineering representative to review the appropriate system build-up for your project. Stonhard offers a variety of sustainability documentation and certifications, including CDPH compliance certificates, Health Product Declarations (HPDs), and Environmental Product Declarations (EPDs). Please contact your Stonhard Architectural Design & Engineering Representative to obtain copies of the applicable documentation for your project.
Material & Finish
Construction
Components are packaged separately and mixed together on-site
Content
A multi-component system consisting of a penetrating epoxy primer, an undercoat, a free-flowing epoxy, curing agents, colored quartz silica aggregate, and sealers. Refer to Product Data sheet for specifics.
Finish
Available in matte or gloss finishes. Standard or medium texture Stonkote CE4 is applied at a thickness that will produce the desired texture
Format
Poured / Liquid
Availability & Procurement
Availability
Typically Stocked, Made to Order / Special Order
City Of Origin
Maple Shade
Country Of Origin
United States
Custom Capabilities
Customize colors, finishes, textures, and patterns. To provide a seal at the joint between the floor and the wall, cove bases in heights from 2in - 6in are available
State Of Origin
New Jersey
Technical Specifications
Impact Resistance
ASTM D-2794 tested. >160 in/lbs.
Overall Thickness
0.125
Product Features
Customizable
Size
Covers approximately 300 sqft per unit
Applications & Usage
Application Filter
Flooring
Installation
A specially trained application crew from Stonhard will complete installation. First, patching, leveling, and priming of the substrate is needed. Components will then be mixed together and uniformly spread over the primed and sealed substrate using a screed applicator. Steel finishing trowels are used to compact and smooth the surface of the material to the required thickness. A chemical reaction between components causes the mixture to harden. Mix and apply the topcoat sealant material over the hardened floor. Installation can only be completed when the slab and air temperatures are between 65° - 85° F. Relative humidity must be below 80%. Refer to manufacturer's documentation for additional information.
Suitable Substrates
Leveled concrete. For questions regarding other possible substrates or an appropriate primer, contact your local Stonhard representative.
Performance Metrics
Abrasion Wear Resistance
ASTM D-4060, CS-17 tested. 0.06 gm max weight loss
Flammability
ASTM E-648 tested. Class 1
Flexural Strength
ASTM C-580 tested. 4,000 psi.
Hardness
ASTM D-2240, Shore D tested. Result between 85 to 90
Light Blocking
Complete
Maintenance
For regular maintenance, use Stonkleen D2G with a mop and bucket or an automatic floor scrubbing machine. Deep cleaning for healthcare environments may require diluted Stonkleen AS9 to remove sanitizing and disinfecting films and residues that are left behind from health code protocols that, over time, will leave heavy build-up and dull the floor. Refer to manufacturer's documentation for additional information
Performance
Has a cure rate of 12 hours for foot traffic and 24 hours for normal operations